My profile • ID:29575432 i.amlovejanilovepindi.walamunda@gmail.com Subscription info Manage users Log out
Try Semrush One for Free
The leading platform that unifies SEO authority and AI visibility.
Get Your Ticket Now
One day. Real strategies. Built for marketers who play to win.
October 13, 2026London, UK
Knowledge Base
Semrush Toolkits
SEO
Link Building Tool
How to Start a Link Building Campaign

How to Start a Link Building Campaign

Need more links but don’t know where to start? Semrush has a Link Building tool designed for the sole purpose of running outreach to acquire links. Follow this workflow to get your campaign going.

To set up the Link Building tool, first create a Folder for your website. If you’ve already created one, navigate to the Link Building tool to set up your campaign under an existing folder. Follow the prompts in the Link Building tool to configure and launch your campaign.

Enter up to 10 keywords that you want to improve your organic rankings for. To further specify the scope of your link-building prospects, take advantage of Google’s advanced search operators.

Link Building tool setup window with a red rectangle highlighting the field where you can add keywords at the top. Also, a red arrow is pointing to the Add button next to this field.

You also need to add up to 10 competitors, whose backlink profiles you consider worthy of replicating. If you do not know what keywords to pick or what competitors to choose, the system will offer you a list based on the information from the Semrush database and the Organic Competitors report. When done, just press “Start Link Building” button.

2. Review your list of prospects

After Semrush finishes collecting the information you’ll be taken to the Overview dashboard where you’ll be able to monitor the progress of your whole campaign: overall prospects, received replies, monitored domains, etc.

An example of the Overview report in the Link Building tool with the following widgets: Domain Prospects, Search by Competitor, Domains in Progress, and Monitored Domains.

The remaining 3 tabs of the Link Building tool: Prospects, In Progress, and Monitor will help you stay in control of your link-building campaign at each stage.

Start with reviewing prospects in the Prospects tab. Choose the ones that are relevant to your website and move them to the In Progress tab using the “To in progress” button opposite the prospect’s link.

Prospects report in the Link Building tool, with a red arrow pointing to the To In Progress button in the last column on the right.

3. Connect your email account and send your pitch

The In Progress tab lets you reach out to the selected prospects* and monitor the status of each of your would-be backlinks.

In Progress report in the Link Building tool with a red rectangle highlighting the Email and Status columns closer to the right of the table.

To contact a prospect, you’ll need to add a mailbox using the “Add” button at the top of the page.

The 'Malbox:Add' is highlighted with a red rectangle at the top.

Your prospects' email addresses are added automatically by Semrush. If the email address field is empty, try these steps or this method to find an email address before moving on to the next prospect. 

*Please note that you should select both consents when connecting to a Gmail email account. If you choose only one, you cannot read or send emails from the Semrush interface. 

The 'Select all' filed is highlighted with a red rectangle in the pop-up window allowing the connection of Backlink Audit to a Google Account.   

4. Keep track of your new links

In the Monitor tab, you can follow the progress of your link-building efforts over time. All your prospective backlinks are marked as Active, Lost, Broken, Undefined, or Rejected after you add the domains you want to monitor to this tab of the tool.

An example of the Monitored Domains widget in the Monitor report in the Link Building tool.

If you are interested in learning more about link building with Semrush, please refer to our Academy course Introduction to Link Building with Semrush.

Recently viewed